Introduction In industrial steel buildings, completing the main frame does not simply mean that the steel members have been erected. What truly determines project quality is whether the design datum, factory fabrication, member dispatch, site erectio...
Read More
This batch of 100 steel road barriers was manufactured for a project in Germany and completed within 22 days. For batch fabrication, production speed is important, but consistency across every unit is the real manufacturing challenge. Each barrier is...
Read More
- Focusing on Engineering Coordination Across Portal-Frame Load Paths, Fabrication Accuracy, Erection Planning, and Roof and Wall Envelope Systems Shenyang Zhongwei Heavy Industry Steel Structure Engineering Co., Ltd. ("Zhongwei Heavy Industry") has ...
Read More
Learn how Zhongwei Heavy Industry delivered a 148,000 m² dairy farm steel structure through portal frame engineering, precision fabrication, erection and envelope coordination.
Read More
Shenyang Zhongwei Heavy Industry Steel Structure Engineering Co., Ltd. has completed the delivery of the steel structure works for the Heilongjiang Xinhui Electrolysis Workshop. Located in Keshiketeng Banner, Inner Mongolia, the project has a buildin...
Read More
Recently, the Northern Aluminum Project, undertaken by Shenyang Zhongwei Heavy Industry Steel Structure Engineering Co., Ltd. (hereinafter referred to as “Zhongwei Heavy Industry”), was successfully completed. Developed around the product...
Read More
Zhongwei Heavy Industry Supports Stable Delivery of Three-Story Steel Frame Projects Through Manufacturing Consistency - Manufacturing Feature on the Zhengzhou Taiheng Machinery Equipment Standardized Factory Project - The Zhengzhou Taiheng Machinery...
Read More
Introduction Recently, the steel structure works for the Longliyuan Food Project in Horqin Left Middle Banner, undertaken by Shenyang Zhongwei Heavy Industry Steel Structure Engineering Co., Ltd. (hereinafter referred to as "Zhongwei Heavy Industry")...
Read More
Zhongwei Heavy Industry Completes Multi-Storey Steel Frame Works for an Intelligent Furniture Production Project Shenyang Zhongwei Heavy Industry Steel Structure Engineering Co., Ltd. (hereinafter referred to as “Zhongwei Heavy Industry”)...
Read More
At 8:08 a.m. on August 8, 2026, as the first batch of steel columns was lifted, positioned, temporarily secured, and initially aligned, an approximately 10,000 m² industrial plant project undertaken by Zhongwei Heavy Industry officially entered ...
Read More
Introduction: In 2023, the "Jilin Xuanhe Beverage 60,000-Tonne Annual Beer Production Project," constructed by Shenyang Zhongwei Heavy Industry Steel Structure Engineering Co., Ltd. (hereinafter referred to as "Zhongwei Heavy Industry"), was successf...
Read More
Shenyang Muguang Ecological Livestock Breeding Base: How a 213,800 m² Steel-Structure Cattle Barn Complex Balances Prefabrication, Life-Cycle Cost, Fire Protection, and Corrosion Control Key Points • Publicly reported project data: a ...
Read More
Hot News2026-06-29
2026-06-29
2026-06-26
2026-06-26
2025-12-26
2025-12-16